When you're ready to print, just click this button:
Make Print-Friendly
Release Coordinator Audit 2
Instructions:
-
What SOP governs the site's General Release Procedures?
-
Who can approve a "Greater than 1" for NCR Lot Disposition?
-
Which of the following testings are NOT included for QFL56 (Fill samples by batch)
A. Pyrogen
B. PM
C. Enviromental
D. Final Chemical
E. Initial Chemical
-
Who must approve a comment made after doc center review?
-
What should we check before creating a sublotted batch in GME?
-
To drop a batch, what are 3 items that we need to check?
-
What is the retention period for Membrane Logs (NC-MB-003)
Release Coordinator Audit 2
(Answer Key)
Instructions:
-
What SOP governs the site's General Release Procedures?
-
Who can approve a "Greater than 1" for NCR Lot Disposition?
-
Which of the following testings are NOT included for QFL56 (Fill samples by batch)
A. Pyrogen
B. PM
C. Enviromental
D. Final Chemical
E. Initial Chemical
-
Who must approve a comment made after doc center review?
-
What should we check before creating a sublotted batch in GME?
-
To drop a batch, what are 3 items that we need to check?
-
What is the retention period for Membrane Logs (NC-MB-003)